Riverview Village Condo 2 bedroom Condo For Rent
7801 Ne 4th Ct, Unit 514, Miami, FL 33138

$2,325 / месяц
Аренда
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Детали


  • МЛС номер:A12027136
  • Виртуальный тур: Да
  • Номер квартиры:514
  • Цена предложения: $2,325
  • Жилая площадь: 967 фут² / 90 м²
  • Цена за фут/метр: $2 / $26
  • Комнаты:2
  • Полных ванн:1
  • Неполных ванн:1
  • Год строительства:1973
  • Разрешены животные:Да
  • На канале:Да
  • Дата публикации:May 29, 2026
  • Дней на рынке:91

Описание


Welcome to Riverview Condo, a rare waterfront opportunity in one of Miami’s most exciting and fast-evolving neighborhoods. Located at 7801 NE 4th Court, this two-level residence places you at the intersection of lifestyle, convenience, and long-term upside, in the heart of the MiMo/Little River corridor, just minutes from Morningside, the Design District, Wynwood, Biscayne Bay, the beach, and downtown Miami. This bright and functional 2-level residence offers the feel of a townhome, with living space and half bathroom on the first level, and 2 bedrooms, 1 full Bathroom upstairs. Enjoy a gated community setting with assigned parking, guest parking, a pool, sauna, laundry in the building, outdoor bike rack, and a newly updated elevator. For water lovers, the property offers a private boat/PWC slip opportunity, kayak storage, and direct canal access leading toward Biscayne Bay and the ocean. Step outside and you are across from Miami Ironside, surrounded by restaurants, design studios, galleries, cafés, and the creative energy that makes Little River one of Miami’s most desirable emerging districts. Just across street has a Supermarket, CVS pharmacy.

Особенности


  • Полы:CeramicTile, Parquet
  • Интерьер:Elevator, FirstFloorEntry
  • Экстерьер:Balcony, Barbecue, Fence
  • На канале:CanalAccess, CanalFront

Расположение


Запросить информацию
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Другие квартиры в Майами


780 Ne 69th St, Unit 1507
Miami, FL 33138
$2,600 / месяц
2000 Towerside Ter, Unit 301
Miami, FL 33138
$3,600 / месяц
4000 Towerside Ter, Unit 908
Miami, FL 33138
$3,800 / месяц
2000 Towerside Ter, Unit 312
Miami, FL 33138
$4,200 / месяц