Highland Manor Sec 6 4 bedroom Single Family House For Rent
17930 Ne 6th Ave, North Miami Beach, FL 33162

$4,000 / месяц
Аренда
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Детали


  • МЛС номер:A11997747
  • Виртуальный тур: Да
  • Цена предложения: $4,000
  • Жилая площадь: 1802 фут² / 167 м²
  • Цена за фут/метр: $2 / $24
  • Комнаты:4
  • Полных ванн:2
  • Год строительства:1965
  • Дата публикации:April 21, 2026
  • Дней на рынке:178

Описание


Beautiful 4-bedroom, 2-bathroom single-family home for rent in North Miami Beach, featuring a spacious layout, an enclosed patio, and a private backyard ideal for relaxing or entertaining. This well-maintained property also includes a storage shed for tenant use, offering added convenience and storage. Tenant is responsible for all utilities, including water, electricity, and trash, as well as yard maintenance. Pet policy allows a maximum of one pet. Any pet over 40 pounds must be presented to the owner for an in-person meeting prior to occupancy. All pets are subject to owner’s prior written approval, granted or denied at owner’s sole discretion. The home features convenient access with a front door keypad entry (no physical key required), which the tenant may reprogram if desired. Tenant will be provided one key for the back door and one key for the laundry room. Conveniently located near major roadways, shopping, and dining options.

Особенности


  • Полы:Tile
  • Интерьер:FirstFloorEntry, LivingDiningRoom
  • Экстерьер:EnclosedPorch, Fence

Расположение


Запросить информацию
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Другие дома в Норт Майами Бич


413 Ne 162nd Street
Miami, FL 33162
$5,800 / месяц
28 Ne 165th Street
Miami, FL 33162
$4,500 / месяц
1758 Ne 177th St, Unit 1758
North Miami Beach, FL 33162
$3,500 / месяц
2040 Ne 174th Street
North Miami Beach, FL 33162
$3,400 / месяц