Hemispheres South 2 bedroom Condo For Sale
1985 S Ocean Drive, Unit LP, Hallandale Beach, FL 33009

$300,000
Продано
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Детали


  • МЛС номер:R11069769
  • Виртуальный тур: Да
  • Номер квартиры:LP
  • Цена предложения: $300,000
  • Цена продажи: $300,000
  • Жилая площадь: 1380 фут² / 128 м²
  • Цена за фут/метр: $217 / $2,340
  • Комнаты:2
  • Полных ванн:2
  • Обслуживание:$1,310
  • Налоги:$7,317
  • Год строительства:1972
  • На канале:Да
  • Дата публикации:March 10, 2025
  • Дата продажи: February 26, 2026
  • Дней на рынке:352

Описание


Resort-Style Living at The Hemispheres South Condo. Experience the ultimate in beachfront living with this rare 1,380 sq. ft. corner unit on the 1st floor of an oceanfront high-rise in the heart of Hallandale Beach. This unit is located 1 floor below lobby, and 1 floor above ground, as you can see in the photos. This spacious 2-bedroom, 2-bathroom residence boasts the largest floor plan in the building, offering abundant natural light and a serene coastal ambiance. Property Highlights: Prime East-Facing Exposure - Enjoy sun-filled mornings and an exceptionally quiet beach area, thanks to the community's exclusive location adjacent to Golden Beach. Parking space # 849, right next to the apartment. Storage on the same floor. Move-In Ready - Recently refreshed, modern, and fully furnished with high-end decor and functional design. Spacious Layout - Comfortably accommodates up to 10 guests with 5 queen-size beds and 7 large ceiling-height closets for ample storage. Expansive Living Room - Featuring an abundance of windows, two convertible queen-size couches with built-in storage, and an extendable dining table with hidden storage. Elegant Bedrooms - Primary Suite: Two queen beds, ample space, two walk-in closets, an en-suite bathroom, and a dedicated workspace with four chairs. Second Bedroom: Queen bed, walk-in closet, and a computer desk for work or study. Updated Kitchen & Bathrooms - One bathroom with a shower stall, the other with a bathtub-shower combination. Private Balcony - Overlooks the vibrant HYDE Hotel & Beach Club community with plenty of space to relax. Assigned parking space next to the back entrance for effortless access. You parking space is right next to the apt, back door entrance of the building, open air (no roof). Seller asked for parking to be close to the back entrance, as it is only 30 sec walking distance, and without the need of taking the elevator. If necessary, new owners can request a different parking spot (under roof). Resort-Style Amenities: Beach Services - Umbrellas, lounge chairs, and snack bar. Two Heated Pools - Overlooking the ocean and Intracoastal Waterway + toddler pools. Fine Dining On-Site: Mia Oceanfront Restaurant - Beachfront dining, kids' playroom with babysitter, DJ & events. Juniper on The Water - Bayfront dining with live music & dancing every Thursday. Multiple Fitness Centers - Including a gym in the building, a beachfront gym, and a cardio gym with water views. Recreational Facilities: Tennis & basketball courts, BBQ areas, mini golf, golf driving cage, pool tables, ping pong, and more. Exclusive Resident Perks: Community Bus for easy transport to nearby shopping & dining. Sauna, steam room, jacuzzi, and massage room for ultimate relaxation. Marina with boat lifts & jet ski parking. 24/7 Security & Valet Parking. Package Room to ensure you never miss deliveries. Prime Location: Steps from the beach, just minutes from jet ski & banana boat rentals. Walking distance to shopping, dining, and entertainment, including Walmart, 7-Eleven, Gulfstream Park, Aventura Mall, and Miami's nightlife. HOA & Rental Information: HOA Fee is $1,310.54 includes internet, basic tv, Central Air conditioning, and pest control. Electricity is not included, but it's very cheap, because you're not using it to power A/C. There was an assessment of $60,000. The seller already paid out 10k and will need to pay out 50k before closing. Short & long-term rentals allowed (minimum 3 months). This exceptional residence offers an unparalleled coastal lifestyle with luxury amenities, a prime location, and unbeatable value. Don't miss out on this rare opportunityschedule a private showing today! The building has a new BEACH CAFE besides two restaurants on premises. Beach pool with cabanas should be completed soon.

Особенности


  • Полы:CeramicTile
  • Интерьер:ClosetCabinetry, WalkInClosets
  • Экстерьер:
  • На канале:IntracoastalAccess, OceanAccess

Расположение


Запросить информацию
Людмила Богатов
Людмила Богатов
Брокер по недвижимости

Другие квартиры в Халландейл Бич


1745 E Hallandale Beach Blvd, Unit 2105W
Hallandale Beach, FL 33009
$439,000
1745 E Hallandale Beach Blvd, Unit 306W
Hallandale Beach, FL 33009
$365,000
1755 E Hallandale Beach Blvd, Unit 305E
Hallandale Beach, FL 33009
$350,000
600 Three Islands Blvd, Unit 807
Hallandale Beach, FL 33009
$255,000